2000-2001 Electrical work for the new powerhouse, supplying all utilities (power, chilled water, steam) to the new Midfield Terminal building. Work includes power & controls for 3 – 5.76 MV natural gas generators, 3 – 37.5 Million BTU/hr natural gas high temperature boilers, and 7 – 1280 ton – 4.16Kv centrifugal chillers.