Installation of all electrical work for the construction of Pump Station #11. Project includes the installation of a mile long duct bank, all control, instrumentation, power wiring, including work required for the (6) 900HP storm water pumps.
project photographs ::
AutoViewer requires JavaScript and the Flash Player. Get Flash here.