2000-2001 Electrical work, for the new powerhouse, supplying all utilities, (power, chilled water, steam), to the new Midfield Terminal building. Work includes power & controls for 3 - 5.76 MV natural gas generators, 3 - 37.5 Million BTU/hr natural gas high temperature boilers, and 7 - 1280 ton - 4.16Kv centrifugal chillers.
project photographs ::
AutoViewer requires JavaScript and the Flash Player. Get Flash here.