BRIDGE & TUNNEL PROJECTS :
Ambassador Bridge
Detroit, Michigan
- New Plaza - Installation of new primary power & 130' poles for new site lighting associated with new truck off ramp and installation of new 350Kw generator.
- Installed raceways, wiring (power for License Plate Reader Site Prep, NEXUS "FAST" Program), cabling (instrumentation), power equipment, equipment posts, terminal boxes, concrete poles, antennas and radiation detectors with stands necessary for the LPR, RPM, NEXUS and FAST Program systems. Work included the concrete; saw cutting, trenching and excavation necessary for the extension and addition of traffic islands and equipment foundations.
|