Complete Demolition and Rehabilitation - 6 lane rolling lift bridge in downtown Toledo including a relay logic control system, submarine cable installation, VFD drives, electric brakes, navigational lighting, traffic gates/signaling.
project photographs ::
AutoViewer requires JavaScript and the Flash Player. Get Flash here.