Re-feed of all Kitchen equipment from Emergency Power System.
Design & Build of new primary service, new duct banks, new primary feeders, new 3000Amp main switchboard, reroute of fire alarm and site lighting.
Construction of 150,000 sq. ft. addition and renovation to the existing hospital.
"We have always found [Ferndale Electric] to be knowledgeable regarding code requirements, very responsive to our needs, and extremely capable of any size job we have worked on together over the years."
"We have found them to be cost competitive, and they always bring a customer service philosophy to the project."
"Their commitment to our projects had led me to keep them high on my list for future construction."
DMC – Children's Hospital of Michigan
Detroit, Michigan
Upgrade and modernization of the emergency power and distribution system, feeders and transfer switch scheme.
Replacement of existing emergency generator system add new secondary switchgear and replace and reconfigure the existing automatic transfer switch loads along with adding new transfer switches and controls, replace existing primary metering with a new primary metering system.
DMC – Harper Women's Hospital
Detroit, Michigan
Replace existing 50 year old substation with new state-of-the-art switchgear while maintaining all existing operations.
project photographs ::
AutoViewer requires JavaScript and the Flash Player. Get Flash here.