UTILITY PROJECTS :
International Transmission Co Substation Projects
Six Stations
- Replace fourteen existing 120Kv Oil Circuit Breakers with ABB - SF6 Gas Breakers and associated relay work and control upgrades. Work performed at numerous substations.
Pontiac Station
- Relocate metering equipment from between Rows "C" and "D" to the end of Row "D" as well as erection of a new "H" frame.
St. Clair Victor
- Relay modifications required to bring the new Jacob Station on line. Required working at both stations simultaneously to cut Jacob Station into the relay scheme.
|
|
|